Bentsjordelva

The project Bentsjordelva was sold as part of the fund strategy.

Bentsjordelva is situated in the Troms province in the north of Norway. The power plant with a catchment area of 6,4 km2 and a net head of 410m was put into operation in July 2012 after a construction period of 14 months. The facility has an installed capacity of 2.6 MW with an annual production at 5.1 GWh.