Holdalbekk

The project Holdalbekk was sold as part of the fund strategy.

Hydroelectric power plant Holdalbekk is situated in the municipality of Vinje, province of Telemark, and has been in operation since October 2012. On average the annual production is scheduled to amount to 3.13 GWh with an installed capacity of 1.4 MW. Holdalbekk has a catchment area of about 9 km2. Two creeks are caught in two weirs and then channelled to the power house in a common penstock over a net head of 215m.